About Mark Construction
MARK Construction Inc. specializes in the installation of horizontal directional drilled plastic and steel pipe (boring). MARK Construction’s services include installation of pipe for water, communications, electric and gas.
We have the capability and the tooling to do from ¾” pipe up to 16” pipe or multiple pipes with a diameter up to 16” at one time.
Earning repeat customers and building long term relationships is what we strive for, by providing exceptional customer service, value, and quality.
Recent Projects
Electric and Gas Conduit for Excel Energy
MARK CONSTRUCTION INSTALLS THE CONDUIT FOR GAS MAINS, GAS SERVICES, ELECTRIC MAINS, AND ELECTRIC SERVICES IN ALL PARTS OF COLORADO FOR EXCEL ENERGY THROUGH STURGEON ELECTRIC.
Read MoreSage Communications/Comcast
Sage Communications/Comcast* Installation of main line and service drops. COAX and Fiber. In Summit, Routt and Grand Counties. MARK CONSTRUCTION HAS COMPLETED SEVERAL PROJECTS FOR SAGE COMMUNICATIONS INCLUDING NEW BUILDS, SPAN REPLACEMENTS, AND EMERGENCY JOBS. ON THESE PROJECTS, WE HAVE INSTALLED THE CONDUIT, SET AND PLACED PEDS OR HAND HOLES AND PULLED IN THE FINAL…
Read More4- and 6-inch gas line for Black Hills Energy
GROWING COMMUNITIES MEANS MORE DEMAND. WE HAVE BEEN ABLE TO HELP BY INSTALLING AND UPGRADING MORE THAN 15,000 FT OF GAS LINE IN MONTROSE COUNTY FOR BLACK HILLS ENERGY.
Read More8- and 12-inch waterline for the City of Montrose
This project consisted of upgrading water lines in a growing community to meet demands. Mark crews put in about 1,200 ft of new 8” and 500’ of new 12” pipe for the project.
Read MoreRegion 3 Traffic Signals in Craig and Steamboat
Region 3 Traffic Signals in Craig and Steamboat Springs for Sturgeon Electric.
Read MoreConduit for Sturgeon Electric at Arapahoe Rd
Installation of 2500’ of bored 2” and 3” conduit for Sturgeon Electric at Arapahoe Rd and Cherry Creek for CDOT in Denver, CO
Read MoreHwy 50 and San Juan Avenue
Hwy 50 and San Juan Avenue installation of 2400’ of 3”; 800’ of 2” bored conduit and potholing for CDOT Project C 0501—061 in Montrose, CO.
Read MoreLighting Project for Sorter Construction
City of Grand Junction Lighting Project for Sorter Construction
Read MoreRegion 1 Overhead Signing
Region 1 Overhead Signing in Clear Creek County for Mountain Corridor Constructors CDOT Project FBR 0703-410
Read MoreRegion 1 Culvert Cleaning in Denver
Region 1 Culvert Cleaning in Denver for Cruz Construction CDOT Project SHE0703-428
Read More